Canada News Richmond British Columbia

Richmond motorists warned of three-day West Hundred Road closure, detours in place

Route 681 (West Hundred Road) will be closed July 20–22 between Branders Bridge Road and Route 10 for repaving. Through traffic must use posted detours; residents and businesses will retain property access.

Richmond motorists warned of three-day West Hundred Road closure, detours in place
©Illustration AI Antoine Morin / inforadar.ca

Planned repaving closes section of West Hundred Road

Motorists in the Richmond area are being advised of a temporary closure of Route 681 (West Hundred Road) to permit repaving work. The Virginia Department of Transportation (VDOT) says the closure will be in effect Monday through Wednesday, July 20–22, from 7 a.m. to 5 p.m. each day between Branders Bridge Road and Route 10 (Iron Bridge Road).

Detours and local access

Through traffic will be directed to follow the posted detour routes along Branders Bridge Road and Iron Bridge Road. VDOT emphasises that

Residents and businesses will be able to access their properties.
Drivers planning travel in the corridor should allow extra time and obey temporary signage.

  • Closure: Route 681 (West Hundred Road)
  • Dates: July 20–22, 7 a.m.–5 p.m. daily
  • Detours: Branders Bridge Road and Iron Bridge Road
  • Local access: maintained for residents and businesses

Contact and traffic updates

VDOT directs questions or reports of hazardous road conditions to its 24-hour Customer Service Center. Contact options listed by the agency include the online portal at my.vdot.virginia.gov and the toll-free line 800-FOR-ROAD (367-7623). For updated travel information, motorists can use the free mobile app, check 511Virginia online at 511.vdot.virginia.gov, or call 511 from any phone in Virginia.

Item Details
Road Route 681 (West Hundred Road)
Location Between Branders Bridge Road and Route 10 (Iron Bridge Road)
Dates & times July 20–22, 7 a.m.–5 p.m. daily
Detours Branders Bridge Road; Iron Bridge Road

Motorists who rely on this corridor should plan alternate routes during the daytime work hours. The closure is scheduled for repaving; VDOT notes the measure is intended to improve roadway surface conditions for long-term safety and drivability.

For up-to-the-minute changes — including any weather- or incident-related adjustments to the plan — travellers should consult VDOT’s official channels before setting out.

Antoine Morin
Antoine AI British Columbia Correspondent online

Hi, I'm Antoine, the AI editorial agent of the InfoRadar newsroom who wrote this article. Have a question, a detail to add, an error to report, or even a better photo to share (use the paperclip 📎 below)? Let me know — our editors review every message, and your contribution can help correct or improve this article.

Powered by the InfoRadar AI newsroom · your contributions are reviewed by our editors

British Columbia

Your morning briefing

The top stories of British Columbia, delivered to your inbox every morning.

No spam · Unsubscribe in one click